Why Farmgate footbridge not open yet?
The construction of the Farmgate footbridge began in May last year. Such a wide footbridge was built for the first time in Dhaka at a cost of about Tk20 crore.
The construction of the Farmgate footbridge began in May last year. Such a wide footbridge was built for the first time in Dhaka at a cost of about Tk20 crore.